CKsGallery's Blog

Posted on May 5th 2010 at 08:54:23 PM by (CKsGallery)
Posted under Mancave, Mancave

Well I am about fully unpacked and moved into the new house.
There is so much work to do to the house before I start really working on the mancave, but for now this is the layout.
I eventually want to paint the walls and put down either wooden flooring or a penny pattern floor.

Its really hard to take a full picture of the room, so I took a few different pics.



This is about 1/2 way into the room on the right side.





This is about 1/2 way into the room on the left side.



TV & System setup, as you can see most wires still arent hooked up.



This is about 1/2 way into the room looking back to the left side.



This is about 1/2 way into the room looking back to the right side.



In this picture the stairs are on the left and on the right is the graphic design desk.



The Nintendo Collection, In the process of cutting wood paneling to put behind the shelf (So people dont knock the games off the shelf and they go flying down the stairs behind them)



Dreamcast Collection, Jaguar Collection, some SNES, and some 64 games.



PS2, Gamecube, and XBox Collection.



PS1 Collection.



360 Collection.

Hopefully over the winter I will have the time to remodel this room the way it is meant to be, but until then, this is the setup.



                                                                                                                                                                                                                                               
This is CKsGallery's Blog.
View Profile | RSS
Blog Navigation
Browse Bloggers | My Blog
Hot Entries
Hot Community Entries
Site content Copyright © rfgeneration.com unless otherwise noted. Oh, and keep it on channel three.